Standard Specifications

STANDARD SPECIFICATIONS FOR WATER MAINS, SANITARY SEWERS AND SEWAGE PUMPING STATIONS
APRIL 1993, UPDATED - May 2012

· TABLE OF CONTENTS Revised May 2012

I. GENERAL INFORMATION AND REQUIREMENTS, INVITATION, PROPOSAL AND CONTRACT DOCUMENTS
· General Information and Requirements - Revised and Adopted 4/7/08
· Invitation For Bids - Revised 11/21/2016
· Proposal - Updated 9/28/2018
· Bid Bond - Approved November 2016
· Contract - Revised 07/2014
· Contract Bond - Revised  05/2012
· Labor and Material Bond

II. GENERAL CONDITIONS
Section 1
· Definition of Terms 
Section 2
· Proposal Requirements and Conditions Revised and Adopted 04/06/06 
Section 3
· Award and Execution of Contracts  Approved 07/06 
Section 4
· Scope of Work 
Section 5
· Control of Work 
Section 6
· Control of Material 
Section 7
· Legal Relations and Responsibility to Public 
Section 8
· Prosecution and Progress Revised 04/2018 
Section 9
· Testing Materials

III. CONSTRUCTION SPECIFICATIONS
Section 10 Revised 11/13/2013
· Special Provision
Section 11
· Water Mains Revised 05/07/2018
Section 12
· Sanitary Sewers Revised 05/2012
Section 13
· Sewage Pumping Station Revised 06/03/09 
Section 14
· Removing and Replacing Pavement 
Section 15
· Backfilling 
Section 16
· Erosion Control 
Section 17
· Encasement Pipe 
Section 18 Revised 11/13/2013
· Rehabilitation of Sanitary Sewer Mains By The Cured-In-Place (CIPP) Method 
Section 19
· Rehabilitation of Manholes 
Section 20
·Horizontal Directional Drilling (HDD)/ HDPE Pipe 
Section 21
· Rehabilitation of Sanitary Sewer Mains By The Pipe Bursting and Trenchless Pipe
Section 22
· Lightening Protection System 
Section 23
· Transient Voltage Surge Suppressions added 07/2007
Section 24
· Electrical Materials and Methodsadded 07/2007

 

APPENDICES
Appendix A
· List of Acceptable Products and Approved Manufacturers 
Appendix B
· Water Line Construction Detail (1 Sheet) 
Appendix C
· Sanitary Sewer Construction Details Revised 05/2012
Appendix D
· Sewage Pumping Station Details Revised 06/03/2009
Appendix E
· Sewage Pumping Station Electrical Details (1 Sheet) 
Appendix F
· Project Sign Detail (1 Sheet) 
Appendix G
· Policy for the Control of Backflow and Cross-Connections 
Appendix H - Revised 11/13/2013
· Small and Small Disadvantaged Business 
Appendix I
· Trench Widths and Paving Cut-Backs 
Appendix J
· Irrevocable Standby Letter of Credit 
Appendix K
· Installation Details by Lift Station 
Appendix L
· Sewer Cleanout Detail & Service Connection To Lined S.S. Mains 
Appendix M
· Timber Pile Supports
Appendix N
· Contractor SSO/Unpermitted Discharge Reporting Form Revised 05/2012

AutoCAD Drawings
Click on any of the links below to download the zip file into your CAD software.  
Pumping Station Drawing
Pavement Replacement Details 
Erosion Control Page 1 
Erosion Control Page 2
S.S. Mains
Water Line Construction Details

MAKE A PAYMENT


CALL 251-694-3100 PAY ONLINE

TODAY'S HOURS

Payment Center : 8:00AM - 4:30PMCall Center : 7:00AM - 5:00PM FIND A LOCATION

EMERGENCIES - 24/7/365


CALL 251-694-3165

CONNECT WITH US

Join OUR EMAIL LIST