Stickney Water Treatment Plant Electrical Upgrades

Capital Projects
Ends: Dec 31st, 2099

The E.M. Stickney Water Treatment Plant, initially constructed in 1942 and is Mobile's primary drinking water treatment facility, will be getting a complete overhaul of all electrical systems. This project includes the installation of new generators providing greater electrical capacity and longer operating times when utility power is lost due to storms and other causes.

Cost of Project: $17.3 Million
Estimated Completion Date: February 2024

old maintenance building
An old maintenance building demolished and a new conduit trenched around the plant.

A temporary fuel tank placed after the removal of an underground diesel tank.
A temporary fuel tank placed after the removal of an underground diesel tank.

Contractors changing out lighting receptacles
Contractors have been changing out all receptacles, wiring, and overhead lighting as part of the project.

Contractors installing concrete boxes
Concrete boxes have been installed inside the ground in several locations around the plant to support brand new conduit for all electrical wiring.

The walls for a new structure in the process of being built

A newly constructed structure with completed walls

Construction continues on the new generator building.
Construction continues on the new generator building.

Construction also continues on the new maintenance building.
Construction also continues on the new maintenance building.

A conduit installed in the new maintenance building and the ceiling that covers it.
A conduit has been installed in the main operations building along with the ceiling to cover it.

Map of Stickney Water Treatment Plant

Today's Hours

Call Center: 8:00AM - 5:00PM

Lobby Hours (Kiosk Only): 8:00AM - 4:30PM

Find Locations

Emergencies 24/7/365

251.694.3165

Main Office Address

MAWSS Park Forest Plaza
4725 Moffett Road
Mobile, AL 36618