Standard Specifications

Standard Specifications

STANDARD SPECIFICATIONS FOR WATER MAINS, SANITARY SEWERS AND SEWAGE PUMPING STATIONS
APRIL 1993, UPDATED - May 2012

· TABLE OF CONTENTS Revised May 2012

I. GENERAL INFORMATION AND REQUIREMENTS, INVITATION, PROPOSAL AND CONTRACT DOCUMENTS
· General Information and Requirements - Revised and Adopted 4/7/08
· Invitation For Bids - Revised November 21, 2016
· Proposal - Revised June 2012
· Bid Bond - Approved November 2016
· Contract - Revised July 2014
· Contract Bond - Revised May 2012
· Labor and Material Bond
· Labor and Material Bond

II. GENERAL CONDITIONS
Section 1
· Definition of Terms 
Section 2
· Proposal Requirements and Conditions***Revised and Adopted 04/06/06 
Section 3
· Award and Execution of Contracts ***Approved 07/06 
Section 4
· Scope of Work 
Section 5
· Control of Work 
Section 6
· Control of Material 
Section 7
· Legal Relations and Responsibility to Public 
Section 8
· Prosecution and Progress***Revised July 2014 
Section 9
· Testing Materials

III. CONSTRUCTION SPECIFICATIONS
Section 10 Revised November 13, 2013
· Special Provision
Section 11
· Water Mains ***Revised 2004 
Section 12
· Sanitary Sewers Revised May 2012
Section 13
· Sewage Pumping Station***Revised 06/03/09 
Section 14
· Removing and Replacing Pavement 
Section 15
· Backfilling 
Section 16
· Erosion Control 
Section 17
· Encasement Pipe 
Section 18 Revised November 13, 2013
· Rehabilitation of Sanitary Sewer Mains By The Cured-In-Place (CIPP) Method 
Section 19
· Rehabilitation of Manholes 
Section 20
·Horizontal Directional Drilling (HDD)/ HDPE Pipe 
Section 21
· Rehabilitation of Sanitary Sewer Mains By The Pipe Bursting and Trenchless Pipe
Section 22
· Lightening Protection System 
Section 23
· Transient Voltage Surge Suppressions added 7/2007
Section 24
· Electrical Materials and Methodsadded 7/2007

 

APPENDICES
Appendix A
· List of Acceptable Products and Approved Manufacturers 
Appendix B
· Water Line Construction Detail (1 Sheet) 
Appendix C
· Sanitary Sewer Construction Details Revised 5-2012
Appendix D
· Sewage Pumping Station Details Revised June 3, 2009 
Appendix E
· Sewage Pumping Station Electrical Details (1 Sheet) 
Appendix F
· Project Sign Detail (1 Sheet) 
Appendix G
· Policy for the Control of Backflow and Cross-Connections 
Appendix H - Revised November 13, 2013
· Small and Small Disadvantaged Business 
Appendix I
· Trench Widths and Paving Cut-Backs 
Appendix J
· Irrevocable Standby Letter of Credit 
Appendix K
· Installation Details by Lift Station 
Appendix L
· Sewer Cleanout Detail & Service Connection To Lined S.S. Mains 
Appendix M
· Timber Pile Supports
Appendix N
· Contractor SSO/Unpermitted Discharge Reporting Form Revised May 2012

AutoCAD Drawings
Click on any of the links below to download the zip file into your CAD software.  
Pumping Station Drawing
Pavement Replacement Details 
Erosion Control Page 1 
Erosion Control Page 2
S.S. Mains
Water Line Construction Details

MAKE A PAYMENT


CALL 251-694-3100 PAY ONLINE

TODAY'S HOURS

Payment Center : 8:00AM - 4:30PMCall Center : 7:00AM - 5:00PM FIND A LOCATION

EMERGENCIES - 24/7/365


CALL 251-694-3165

CONNECT WITH US

Join OUR EMAIL LIST