October 21, 2021
Contact: Douglas Cote, Plant Ops. Dir., 694-3165, dcote@mawss.com
Wastewater Overflow
1725 Dauphin Island Pkwy. (Rear on Easment)
Mobile Area Water & Sewer System (MAWSS) responded to an intermittent wastewater overflow that occurred over three days, beginning October 18 – 21, on an easement at the rear of 1725 Dauphin Island Pkwy. The overflow has stopped. Approximately 4,320 gallons of wastewater flowed into Rabby Creek due to debris and a break on a low-pressure sewer force main. MAWSS crews have repaired the force main and are taking steps to prevent future overflows at this location.