Standard specifications for water mains, sanitary sewers and sewage pumping stations
I. GENERAL INFORMATION AND REQUIREMENTS, INVITATION, PROPOSAL AND CONTRACT DOCUMENTS
· General Information and Requirements
· Invitation For Bids
· Proposal
· Proposal Change of Sub-contractor form
· Bid Bond - Updated 6/10/2020
· Contract
· Contract Bond - Revised 11/2020
· Labor and Material Bond
II. GENERAL CONDITIONS
Section 1
· Definition of Terms
Section 2
· Proposal Requirements and Conditions
Section 3
· Award and Execution of Contracts
Section 4
· Scope of Work
Section 5
· Control of Work
Section 6
· Control of Material
Section 7
· Legal Relations and Responsibility to Public
Section 8
· Prosecution and Progress
Section 9
· Testing Materials
III. CONSTRUCTION SPECIFICATIONS
Section 10
· Special Provision
Section 11
· Water Mains
Section 12
· Sanitary Sewers
Section 13
· Sewage Pumping Station
Section 14
· Removing and Replacing Pavement
Section 15
· Backfilling
Section 16
· Erosion Control
Section 17
· Encasement Pipe
Section 18
· Rehabilitation of Sanitary Sewer Mains By The Cured-In-Place (CIPP) Method
Section 19
· Rehabilitation of Manholes
Section 20
· Horizontal Directional Drilling (HDD)/ HDPE Pipe
Section 21
· Rehabilitation of Sanitary Sewer Mains By The Pipe Bursting and Trenchless Pipe
Section 22
· Lightening Protection System
Section 23
· Transient Voltage Surge Suppressions
Section 24
· Electrical Materials and Methods
Section 25
· Stand-By Generator & ATS Guideline Specifications
APPENDICES
Appendix A
· List of Acceptable Products and Approved Manufacturers
Appendix B
· Water Line Construction Detail (1 Sheet)
Appendix C
· Sanitary Sewer Construction Details
Appendix D
· Sewage Pumping Station Details
· Drawings
· Sewer Pumping Station Guideline Specifications
Appendix E
· Electrical Drawings
Appendix F
· Project Sign Detail (1 Sheet)
Appendix G
· Policy for the Control of Backflow and Cross-Connections
Appendix H - Revised 11/13/2013
· Small and Small Disadvantaged Business
Appendix I
· Trench Widths and Paving Cut-Backs
Appendix J
· Irrevocable Standby Letter of Credit
Appendix K
· Installation Details by Lift Station
Appendix L
· Sewer Cleanout Detail & Service Connection To Lined S.S. Mains
Appendix M
· Timber Pile Supports
Appendix N
· Contractor SSO/Unpermitted Discharge Reporting Form Revised 05/2012
AutoCAD Drawings
Click on any of the links below to download the zip file into your CAD software.
Pumping Station Drawing
Pavement Replacement Details
Erosion Control Page 1
Erosion Control Page 2
S.S. Mains
Water Line Construction Details
MAWSS Park Forest Plaza
4725 Moffett Road
Mobile, AL 36618